Site 8 – east pickard bay
wave energy converter & floating wind component test site
123Ha Area
10m – 29m Depth
Wave resource:
1.52m Hs (annual mean)
9 seconds peak period (annual mean)
13.60m Hmax
Testing Activities Supported
Scaled wave energy converter (WEC) devices
full-scale wave energy converter (WEC) devices
Floating wind component and subassembly
Support structures, moorings & foundations
Scientific instruments & monitoring equipment
Location
East Pickard Bay is the largest site located outside of the Milford Haven Waterway.
Site Features at a glance
- 10m – 29m depth
- 123ha area
- Wave resource:
- 1.52m Hs (annual mean)
- 9 seconds peak period (annual mean)
- 13.60m Hmax
- Seabed – predominantly sand. Small areas of hard substrate.
More detailed information
- The largest of our sites outside of the Milford Haven Waterway, East Pickard Bay is a highly energetic site for full scale wave device and FLOW component testing.
- The site has an area of 956,634m2 (665m x 2300m) and shoals towards the shore from 27m to 15m.
- The seabed at the site is sandy and flat with a few rocky patches and flanked by rocky reef inside the northern boundary.
East Pickard Bay Gallery
Want to discuss this test site?
If you have a marine energy project that you are looking to test at this site or any of our others, please get in touch.
With over a decade of experience in the marine renewables industry, our team can also provide support on a range of topics including project management, consenting and stakeholder engagement.
Other open water Test Sites
Dale Roads
Wave Test Site
Warrior Way
Tidal Stream Test Site