Site 6 – Warrior Way

Tidal stream test site  

9.3Ha Area

2m – 20m Depth

1.5m/s tidal stream resource

Testing Activities Supported

Scaled Tidal Devices

Micro Tidal Devices

Support structures, moorings & foundations

Scientific instruments & monitoring equipment

Instruments, components and subassemblies

ROV or other monitoring equipment

Site preparation
methodologies

Research & Innovation

 

Decommissioning
methodologies

Salvage
methodologies

Location

Our Warrior Way site is located upstream of the Cleddau Bridge in Pembroke Dock.

 

Site Features at a glance
  • 2m – 20m depth
  • 9.3ha area
  • 1.5 m/s (2.9knt) tidal stream resource
  • Seabed – mixed sediment. Poorly sorted, mostly angular gravel to cobbles. Some larger stones / boulders. Some small areas of hard ground / reef.
More detailed information
  • The Warrior Way site is our primary tidal device test site.
  • Located upstream of the Cleddau Bridge, it spans 93,000m2 (200m x 125m) in a long rectangle shape.
  • The depths at the site range from 2m to 20m, with the substrate mainly consisting of sand and gravels.
  • There are some patches of reef / foul ground which have been mapped and should be avoided. 

Warrior Way Gallery

Want to discuss this test site?

If you have a marine energy project that you are looking to test at this site or any of our others, please get in touch.

With over a decade of experience in the marine renewables industry, our team can also provide support on a range of topics including project management, consenting and stakeholder engagement.

 

Other open water Test Sites

Dale Roads

Wave Test Site

East Pickard Bay

Wave Test Site