site user(s):

Porpoise Power and Rudders Boatyard.

technology tested:

Tidal energy convertor using an oscillating hydrofoil to capture energy from the flow of water.

sites used:

Warrior Waysite provides a 1.5 m/s tidal stream resource during peak spring flow.​​

duration of deployment:

February 2025 – 1 month.

​test aims:

The primary test aim was to evidence oscillation of the fin blade and power generation in an operational environment.

​test outcome:

The primary test aims were successfully achieved, and learnings realised on how the whole system, including a swinging mooring, as well as deployment operations, work in the real world across a range of different environmental conditions.